Industrial Light-Duty Glue Applicator - 380°F Hot Melt, 1 Each

$30.42
/ each
Request bulk pricing
Ships from the nearest of 5 US warehouses · freight calculated at checkout
30-day returns on stock items · Return policy
Inside dimensions
N/A × N/A
Board / material
N/A
Color
Black
Freight class
Class 85
Specifications
| Inside dimensions | N/A × N/A (L × W) |
|---|---|
| Board / material | N/A |
| Color | Black |
| Order in multiples of | 1 |
| Each weight | 1.0 lb |
| Outer carton (shipping) | 9.75 × 9.25 × 2.0 in |
| LTL freight class | Class 85 |
| GTIN | 841436057523 |
| SKU | GL4080 |
About this item
SKU GL4080 — N/A × N/A, N/A, Black.
hot melt glue applicator engineered for high-volume industrial packaging operations. Delivers up to 2.5 pounds of adhesive per hour with reliable 380°F heating and 80-watt power output. Compatible with all standard industrial glue sticks, the dependable fastener solution for secure box sealing and product assembly.
Common questions
Does the GL4080 work with all glue stick brands and types?
Yes, the GL4080 is engineered for universal compatibility with all industrial glue sticks on the market. This eliminates supplier lock-in and allows you to source adhesives competitively, maximizing your packaging procurement savings.
How long does it take to reach full operating temperature?
The 80-watt heating element rapidly reaches 380°F, enabling quick startup and minimal production delays. Typical heat-up time is 3-5 minutes, allowing your team to begin applications shortly after power-on.
Is the GL4080 suitable for high-volume production runs?
The GL4080 is classified as light-duty and optimized for mid-volume applications delivering 2.5 lbs/hour. For ultra-high-speed lines exceeding 300+ units per hour, industrial heavy-duty models may provide better throughput; contact our team for guidance on your specific production requirements.
What makes this glue applicator more cost-efficient than manual adhesive application?
Automated adhesive dispensing reduces labor overhead, minimizes glue waste through precise metering, and accelerates packaging line throughput. Most buyers report ROI within 2-4 months through reduced labor costs and improved first-pass quality on sealed shipments.
Order support
Questions on specs or freight?
Send the SKU, quantity, and delivery ZIP and we will confirm specs, availability, and freight before you order.



